
About us
A young company with a serious approach. Since 2021 we have been building facades and finishing works — with our own team, vehicles and equipment.
Our story
AMIVIL GRADNJA j.d.o.o. was founded in January 2021 in Vukovar with a clear focus: facades and finishing works done without compromise.
Since then we have worked on apartment buildings, houses and residential complexes — in and around Dubrovnik, in Komolac, Zaton and Cavtat, and on the island of Vis. Distance from our base is no obstacle: the team arrives with its own vehicles and equipment and stays on site until the job is done.
We are not trying to be the biggest company in the trade. We want to be the one you recommend.

Approach and standards
- A system, not improvisation
- We build facade systems as a whole, from substrate preparation to finish render, following the system manufacturer’s guidelines.
- Details around openings
- Most facade problems start around windows, doors and junctions. That is where we spend the most time.
- A clean site
- We protect joinery, floors and surroundings, and leave the site tidy at the end of every working day.
- Documented phases
- We photograph the key phases of the work, so you know what lies beneath the final coat.
Where we work
Our base is in Vukovar, and we work wherever the job is: in recent years mostly in southern Dalmatia and on the island of Vis.
Where we have worked
- VukovarHeadquarters
- Dubrovnik3 projects
- Vis2 projects
- Zaton1 project
- Cavtat1 project
- Komolac1 project

On site
Our own team, our own vehicles and equipment. In 2025 the company had 15 employees.
How we work
Six steps from the first conversation to handover — each agreed in advance, so there are no surprises.
Step 1: Contact
Describe your project by phone, email or the form. Photos and drawings speed up the assessment.
Step 2: Consultation
We visit the building, inspect the substrate and existing condition, and agree on scope and materials.
Step 3: Planning
You receive a written quote with the scope, materials, timeline and schedule.
Step 4: Execution
Our own team carries out the work, layer by layer, following trade rules and the system manufacturer’s technical guidelines.
Step 5: Quality control
Every phase is checked before the next: flatness, joints and the details around openings.
Step 6: Handover
A joint walkthrough, scaffolding removed and the site cleaned. Handover only when everything is as agreed.

Have a project?Let’s talk.
Send us the basics and a few photos of the building — we will get back to you with a proposal and an indicative quote.